Manual sealing connection tool for tubes and bores with broad tolerance and low pressures (< 50 psi/3.4 bar).

Typical Lead time is 1-2 weeks, but varies based on demand.

Unit of Measure

Specifications

Brands

N/A EZ Connect® FasTest GTek Automation

Connection Size

N/A 1/4 in

Connection Type

N/A National Pipe Thread (NPT)

Seal Material

Main Seal Material

N/A Neoprene®

Internal Seal Material

N/A Buna-N

Note for Seal Material

N/A

Additional seal material types available.